Hi,
I have a column with dates when the last inspection was performed (e. g. 2022-01-12). Another column contains amount of days until the next inspection (e. g. 365, 730 and etc.). I would like to create a third column, which would show the date = last inspection date + days until the next inspection. Can someone help to achieve it? Thanks in advance.
Cheers,
Concrete
Solved! Go to Solution.
@concrete , In date you can add days as the number
a new column
next inspection date = [last inspection date] + [days until the next inspection]
@concrete , In date you can add days as the number
a new column
next inspection date = [last inspection date] + [days until the next inspection]