Hi,
I have projects which have a residual amount that needs to be used before the enddate. So i calculated the amount that has to be spend per month before the enddate. I made a matrix and the result is this:
So in the mond of the enddate of an project u see the amount that's need te be used per month for the rest of the duration of the project.
I would like to fill the empty months with the value of the enddate. In the model i have a relation between enddate and the datetable which is used in de columns of the matrix.
Which DAX formula can help me fill up the empty columns?