Register now to learn Fabric in free live sessions led by the best Microsoft experts. From Apr 16 to May 9, in English and Spanish.
I have downloaded the sankey visual 1.10.0 from the Marketplace but it appears to me that the precentage weight isn't accurately show the difference between flows.
From the source to destination I have flows ranging from 0.5 to 4 to 46% but the flow widths are a similar size for 0.5% and 4% and the 46% flow isn't much wider than either of them. My flow precentages are (0.5%, 0.5%, 4%, 4%, 41%, 46%)
If I don't have a precentage count calculation on the weight I get more realistic thicknesses but I would like to see the % that flows from source to destination
Am I using the Sankey correctly?
Do you want to show percentage values? Am i correct?
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
Yes and have the precentage value be represented by the weight/thickness of the connector. Not sure if the precentage should be broken down by source or destination or part there of. What I mean by that is maybe the option to decide if the precentage is based on the source, the destination or each element within the source, destination
Can you share a pbix (Power BI) report to assign it to the task for testing?
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
Thanks. We got the email.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
Covering the world! 9:00-10:30 AM Sydney, 4:00-5:30 PM CET (Paris/Berlin), 7:00-8:30 PM Mexico City
Check out the April 2024 Power BI update to learn about new features.
User | Count |
---|---|
5 | |
2 | |
1 | |
1 | |
1 |