Earn a 50% discount on the DP-600 certification exam by completing the Fabric 30 Days to Learn It challenge.
I cant get the Gantt visual to work. It is showing a blank screen. I am running Version: 2.50.4859.502 64-bit (September 2017) and gantt 1.3.0.0 I have tried using the demo version from the website and it runs. However if I remove that data and try reloading it again the visual goes blank with no Task information being displayed.
Am I doing something wrong?
Thanks
Gary
Solved! Go to Solution.
HI @garz88,
I can't reproduce your issue. I test on similar power bi desktop with gantt 1.3.0 (import form store). Gantt chart works well on my side.
Can you please share some detail contents about this issue?
Regards,
Xiaoxin Sheng
Hi,
I'm facing the same issue, my gantt chart 2.2.3 is working well on the Desktop but it showing as blank on Power BI service?
Can somebody help,
Thanks,
also
update helped me
HI @garz88,
I can't reproduce your issue. I test on similar power bi desktop with gantt 1.3.0 (import form store). Gantt chart works well on my side.
Can you please share some detail contents about this issue?
Regards,
Xiaoxin Sheng
I have managed to get it working if I add durations. The file I was using only had start dates so the issue was my own making. I would add that it behaves different to the instructional videos. As until a duration is added nothing will show in the Gannt charts see screenshots. I have added a 3 day sample into the screen shot that has now allowed it to display the information.
Thanks for your quick responce.
My Gant Chart is working but there are several data sets with a duration of 1 day. These do not show up in the visual. When I hover over the space under Duration: it says "false days".
Nevermind! My Duration min was set to 1.
My Gant Chart is working but there are several data sets with a duration of 1 day. These do not show up in the visual. When I hover over the space under Duration: it says "false days".