Register now to learn Fabric in free live sessions led by the best Microsoft experts. From Apr 16 to May 9, in English and Spanish.
Hi all,
I have configured in PowerBI Desktop a date slicer to change options between Relative Date, Dropdown, After, etc. The problem that I have is when I publish my report to powerBI.com that option doesn't appear even I can't see the little arow on top of my slicer where I can change the options, is there a problem with that? Do I need to select another option? Is that function doesn't exist in PowerBI service?
Best regards
Hey @miguel1206 ,
basically, it's not possible to change the slicer type.
If you want to change the slicer type after the pbix is published to the workspace you, meaning a report developer, can change the slicer type if you enter the edit mode of the report.
After the report is published to an app, the above will not be possible any longer.
Regards,
Tom
Covering the world! 9:00-10:30 AM Sydney, 4:00-5:30 PM CET (Paris/Berlin), 7:00-8:30 PM Mexico City
Check out the April 2024 Power BI update to learn about new features.