Earn the coveted Fabric Analytics Engineer certification. 100% off your exam for a limited time only!
Hi,
I am facing a small challenge; I need to show operation by shifts.
I have one table with shafts in it
and a table with the operation time
I am lost how to show the operation by shift, Can I get an advice how to do this?
Thank you
Hey!
What's your goal? Can you share an example of what you're trying to see as the result?