Earn the coveted Fabric Analytics Engineer certification. 100% off your exam for a limited time only!
Stepped line chart in power bi is changing the course in the middle of two points, is there any way to push the line all the way to next point before it drops or rise? see the sample below
Solved! Go to Solution.
Hi @Anonymous
Maybe this isn't a solution but i used Power KPI 2.0.0 from Marketplace and in Format -> Line options choose Step-After. I used fields Axis and Values only. In my case it looks like that:
Hi @Anonymous
Maybe this isn't a solution but i used Power KPI 2.0.0 from Marketplace and in Format -> Line options choose Step-After. I used fields Axis and Values only. In my case it looks like that:
HI @pak
is their an possibility to Format the x-Axis. So I have time from a time table and want 00:00:00 as the beginning and 23:59:59 the End. Do you know a solution for that with the Power KPI 2.0.0 Visual ?
Many thanks,
Hi @Ahak
I resigned from using Power KPI because I have a lot of data and it wasn't working well with it.
So I can't help with your question.
Hi all, @pak
Does anybody have a solution for creating a stepped stacked area chart? I have the same issue where the step occurs mid-way between the two points.
Many thanks in advance.
HI @Anonymous,
I think it is hard to achieve this requirement, can you please share some sample data for test?
Regards,
Xiaoxin Sheng
sure, you can download the sample data from here, https://drive.google.com/file/d/1MDxKjEwi1YCRFqk_RKJnm0Dp8na7Eqq_/view?usp=sharing
HI @Anonymous,
It seems like I failed to modify the line graph, I try to use measure to change graph but it effect visual graph and show data on wrong point.
I'd like to suggest you submit an idea for modify step effect to let graph trend to high point.
Regards,
Xiaoxin Sheng
Also, pls share what you did with measures, i would like to show it to my business users to see if they like that option.
@Anonymous I also have this requirement. Were you able to find a solution in the end?
will there be a possibility to add another data point using measures (at run time for only the data set we are dealing with for the chart at that time) right before the next data point, may be with one second before, with same value as previous data point and then instead of using stepped line chart we just use the line chart so it will connect three points in such a way that it will look like what i am asking to achieve? since our data behind the scene is too large, i would like to do something like this only on run time so performacne doesn't get impacted.
User | Count |
---|---|
141 | |
113 | |
104 | |
78 | |
64 |
User | Count |
---|---|
136 | |
125 | |
107 | |
70 | |
61 |