mattross19 Frequent Visitor
Frequent Visitor

Display Shortest & Longest Project Duration

Hello - 

 

I'm working with a large time entry data set. I'm looking to show 2 cards, 1) with the shortest project duration and 2) with the longest project duration. 

 

What is the best way to show this? 

 

Thanks in advance,

Matt 

1 ACCEPTED SOLUTION

Accepted Solutions
rajendran Super Contributor
Super Contributor

Re: Display Shortest & Longest Project Duration

Hi

Create 2 new measures

 

Shortest_Duration = MIN(Proj_duration)

Longest_Duration= MAX(Proj_duration)

 

and place them on 2 cards.

 

Thanks

Raj

View solution in original post

1 REPLY 1
rajendran Super Contributor
Super Contributor

Re: Display Shortest & Longest Project Duration

Hi

Create 2 new measures

 

Shortest_Duration = MIN(Proj_duration)

Longest_Duration= MAX(Proj_duration)

 

and place them on 2 cards.

 

Thanks

Raj

View solution in original post

Helpful resources

Announcements
Coming Soon: T-Shirt Design Contest

Coming Soon: T-Shirt Design Contest

Keep your eyes open for our upcoming T-shirt design contest!

Meet the 2020 Season 1 Power BI Super Users!

Meet the 2020 Season 1 Power BI Super Users!

It’s the start of a new Super User season! Learn all about the new Super Users and brand-new tiered recognition system.

Super User Challenge: Can You Solve These?

Super User Challenge: Can You Solve These?

We're celebrating the start of the New Super User season with our first ever Super User 'Can You Solve These?' challenge.

Power Platform Online Conference

Power Platform Online Conference

Join us for the first ever Power Platform Online Conference!

Top Solution Authors
Top Kudoed Authors