Convert data / Machine Utilisation

Hello,

 

On my other tables i have the data formatted as time so I can convert to total seconds and then divide by the seconds in the working day (In order to get Utilisastion)

  • Is there a way to convert the "Drilling Time" column to time in hh:mm:ss format. It currently is displaying as Text but the data appears in mm:ss e.g 02:37 is 2 minutes and 37 seconds
  • Is it possible to also convert the "production time"column to time in hh:mm:ss format. The whole number data is in seconds eg 10 is 00:00:10.   

 

I would ideally like to add the drilling time and production time together for each part.  Then divide by seconds in the day.

 

I may be going about this the wrong way so I am open to suggestions and new methods.

 

Thanks,

 

2222.JPGDrilling Time111.JPGProduction Time

2 REPLIES 2
v-xicai New Contributor
New Contributor

Re: Convert data / Machine Utilisation

Hi @CraigDykes ,

 

You can create column or measure using DAX below. Then convert them to Time data type.

 

Column:

 

convert Drilling Time = FORMAT(CONCATENATE("00:",Table1[Drilling Time]),"hh:mm:ss")

 

convert Production Time = var d=IF(Table1[Production Time]=BLANK(),"00:00:00",IF(LEN(Table1[Production Time])=1,CONCATENATE("00:00:0",Table1[Production Time]),CONCATENATE("00:00:",Table1[Production Time])))

return FORMAT(d,"hh:mm:ss")

 

Measure:

 

convert Drilling Time measure = FORMAT(CONCATENATE("00:",MAX(Table1[Drilling Time])),"hh:mm:ss")

 

convert Production Time measure = var d=IF(MAX(Table1[Production Time])=BLANK(),"00:00:00",IF(LEN(MAX(Table1[Production Time]))=1,CONCATENATE("00:00:0",MAX(Table1[Production Time])),CONCATENATE("00:00:",MAX(Table1[Production Time]))))

return FORMAT(d,"hh:mm:ss")

2.png3.png

Best Regards,

Amy

 

If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

 

CraigDykes Regular Visitor
Regular Visitor

Re: Convert data / Machine Utilisation

Thats a huge Help amy and nearly 100% there.

 

I have just found out that some of the data in the production time data is greater that 60 seconds so I am unable to convert to time.

Any suggestions @v-xicai ?

 

amy.JPG

 

some Drilling time is also greater than 60 minutes

dt.JPG

Thanks for your help thus far