Earn the coveted Fabric Analytics Engineer certification. 100% off your exam for a limited time only!
Hello.
We have report, published to PowerBI. Report connects to on-premise Project 2016 via oData. Data source settings are:
On the same server I'v installed on-premise gateway and created a datasource.
But when I'm trying to manually or schedully refresh this report, I get error:
Underlying error message: Credentials are required to connect to the OData source
What could be reason of this error, assuming that credentials were provided in data source earlier?