Earn the coveted Fabric Analytics Engineer certification. 100% off your exam for a limited time only!
Hi,
I have the requirement of integrating Easy Redmine (Project Management tool) with Power BI to create various project management reports.
Most of the PM reports need historical data. In Power BI Desktop, there seems no way of getting historical data using the API option.
Since there is no content pack associated with the particular tool, the automatic refresh can't be done, if the reports are uploaded to the online services.
Please suggest the possible ways to integrate the same.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.